Fire damage to a listed building can be devastating, and the immediate priority is always to make the structure safe and begin reinstatement works as quickly as possible. However, even where repairs are intended to be like-for-like, Listed Building Consent (LBC) is often still required before works can proceed.

Listed Building Consent is needed for any works that affect the character of a listed building as a building of special architectural or historic interest. In the case of fire damage, this can include:

  • Replacement of structural timber elements

  • Rebuilding damaged masonry

  • Repairs to historic interiors

  • Roof reconstruction following fire spread

  • Even where works are intended to replicate what was there before, consent is typically required because the works involve loss and replacement of historic fabric.

Are emergency works exempt?

There is often confusion around emergency works. While urgent works to make a building safe may be carried out without prior consent in some circumstances, this does not remove the need for:

  • Retrospective consent, or

  • Consent for full reinstatement works

It is always advisable to engage with the local planning authority as early as possible.


How does this affect insurance claims?

For loss adjusters and property professionals, the need for Listed Building Consent can introduce delays into the claims process.

Without consent:

  • reinstatement works cannot fully proceed

  • contractors may be delayed

  • costs and programme can escalate

This is why early preparation of a heritage statement for Listed Building Consent is critical.

Getting consent in place quickly

For insurance-led repair schemes, the scope of works is usually clear and based on reinstatement. In these cases, a proportionate heritage statement can:

  • justify like-for-like repairs

  • demonstrate compliance with policy

  • support a smooth consent process


Aurora Heritage specialises in heritage statements for fire-damaged listed buildings, with a 10 working day turnaround to help keep projects moving.

👉 If you need support, see our dedicated page: Listed Building Consent for Insurance Repairs


Share


Comments

Leave a comment on this post

Thank you for for the comment. It will be published once approved.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.